Lock 44 at Sladen, with traditional grassy towpath ahead. Photo: Peter Whitehead
Getting the rope past a gate on the towpath. Photo: Peter Whitehead
Arrival on the Summit level with Savile. Photo: Peter Whitehead
Setting off along the Summit level. The narrow towpath track with its broad grass verges gives this section a pleasantly rural feel.Photo: Peter Whitehead
On the Summit level, approaching the Festival Finale site. Photo: Peter Whitehead
Elland moored at the canal-side Bare Arts, which is Todmorden's only brewery, and also an art centre dedicated to nude art. The crew had a good night here. On the beer! The crew are seen artistically creating a flower arrangement. Photo: Kathy Cook
Elland and Bilbo, outside Bare Arts, beside the Great Wall of Todmorden, above which runs the railway. Photo: Kathy Cook
Locals take photos as Bilbo and Elland start the day. Photo: Kathy Cook
Elland under way, passing the Great Wall of Tod. Photo: Kathy Cook
En route for the guillotine lock, Todmorden, Lock 19. Photo: Kathy Cook
Elland watched as she exits the guillotine lock. Photo: Kathy Cook
Elland moored opposite Fielden Wharf, Todmorden. See art work on wall of metal fish. Photo: Kathy Cook
Checking the horse tunnel beside the guillotine lock. Photo: Kathy Cook
Bilbo uses the horse tunnel, Lock 19. Photo: Kathy Cook
Elland and Bilbo re-united after the guillotine lock and horse tunnel. Photo: Kathy Cook