|
Photograph Gallery 6 - Legging Standedge Tunnel

The photos on this page show the legging of the Ashton Packet Boat Company's historic narrowboat Maria through Standedge Tunnel by members The Horseboating Society on May 7th 2006.
This was the first time a boat had been legged through the 3.25 mile long tunnel since 1947.
The journey was completed in 2 hours 52 minutes. Eight leggers, working in pairs, took turns of about 20 minutes each. Also on the boat were Horseboating Society members Ronnie Barnes, aged 87, and his wife, Sheila. Ronnie worked on the canal in his twenties and legged maintenance boats through the tunnel. He came along to watch 'younger' society members "follow in his footsteps".
While Maria was legged through the tunnel, Nigel Dix walked Bonny the Boathorse over the top and a large group of walkers followed them over the moorland.
|